-----====={ TIMER STARTING }=====----- -----Timer set: 300.0 minutes ----- -----Priority System: OFF ----- -----=====~~~~~~~~~~~~~~~~~~=====----- NOTICE: Order to shut down Shovel n°1 received. NOTICE: Order to shut down Shovel n°2 received. NOTICE: Order to shut down Shovel n°3 received. NOTICE: Order to shut down Crusher received. SHUTDOWN: Shovel n°2 is shutting down now... (1100 Tonnes of Ore loaded on trucks). Idle time (after first truck passed through): 44.0 minutes. Total Time Lost due to Trucks stuck in line: 130.98 minutes. SHUTDOWN: Shovel n°3 is shutting down now... (1150 Tonnes of Ore loaded on trucks). Idle time (after first truck passed through): 39.0 minutes. Total Time Lost due to Trucks stuck in line: 149.47 minutes. SHUTDOWN: Shovel n°1 is shutting down now... (1100 Tonnes of Ore loaded on trucks). Idle time (after first truck passed through): 47.0 minutes. Total Time Lost due to Trucks stuck in line: 169.27 minutes. SHUTDOWN: Crusher is shutting down now... (3350 Tonnes of Ore processed. Idle time (after first truck passed through): 1.0 minutes. Total Time Lost due to Trucks stuck in line: 741.27 minutes. Statistics for the Ryan Clemence 20T truck assigned to Shovel n°1 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 240.0 Tons Time in line at Shovel: 89.7 minutes Time in line at Crusher: 70.76 minutes Transit Time: 55.46 minutes Actual Work Time: 86.68 minutes Total Run Time: 302.62 minutes Throughput: 0.79 Tons of Ore/minute Statistics for the Dimitri Berlokovitz 20T truck assigned to Shovel n°1 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 260.0 Tons Time in line at Shovel: 69.81 minutes Time in line at Crusher: 82.34 minutes Transit Time: 57.86 minutes Actual Work Time: 92.24 minutes Total Run Time: 302.26 minutes Throughput: 0.86 Tons of Ore/minute Statistics for the Jean-Pierre LaMalice 50T truck assigned to Shovel n°1 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 600.0 Tons Time in line at Shovel: 9.75 minutes Time in line at Crusher: 76.73 minutes Transit Time: 64.36 minutes Actual Work Time: 163.25 minutes Total Run Time: 314.09 minutes Throughput: 1.91 Tons of Ore/minute Statistics for the Ronald Hochobar 20T truck assigned to Shovel n°2 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 240.0 Tons Time in line at Shovel: 70.5 minutes Time in line at Crusher: 102.81 minutes Transit Time: 50.96 minutes Actual Work Time: 84.72 minutes Total Run Time: 309.01 minutes Throughput: 0.77 Tons of Ore/minute Statistics for the Julie Lafontaine 20T truck assigned to Shovel n°2 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 260.0 Tons Time in line at Shovel: 57.09 minutes Time in line at Crusher: 99.64 minutes Transit Time: 58.26 minutes Actual Work Time: 93.52 minutes Total Run Time: 308.52 minutes Throughput: 0.84 Tons of Ore/minute Statistics for the Big John 50T truck assigned to Shovel n°2 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 600.0 Tons Time in line at Shovel: 3.38 minutes Time in line at Crusher: 67.42 minutes Transit Time: 64.2 minutes Actual Work Time: 165.45 minutes Total Run Time: 300.45 minutes Throughput: 1.99 Tons of Ore/minute Statistics for the Scout 20T truck assigned to Shovel n°3 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 240.0 Tons Time in line at Shovel: 71.11 minutes Time in line at Crusher: 96.97 minutes Transit Time: 52.08 minutes Actual Work Time: 82.27 minutes Total Run Time: 302.43 minutes Throughput: 0.79 Tons of Ore/minute Statistics for the Ruby 20T truck assigned to Shovel n°3 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 260.0 Tons Time in line at Shovel: 76.69 minutes Time in line at Crusher: 81.58 minutes Transit Time: 56.46 minutes Actual Work Time: 89.92 minutes Total Run Time: 304.66 minutes Throughput: 0.85 Tons of Ore/minute Statistics for the Pyro 50T truck assigned to Shovel n°3 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 650.0 Tons Time in line at Shovel: 1.66 minutes Time in line at Crusher: 62.99 minutes Transit Time: 68.64 minutes Actual Work Time: 184.79 minutes Total Run Time: 318.1 minutes Throughput: 2.04 Tons of Ore/minute BUILD SUCCESSFUL (total time: 5 minutes 22 seconds)