-----====={ TIMER STARTING }=====----- -----Timer set: 300.0 minutes ----- -----Priority System: ON ----- -----=====~~~~~~~~~~~~~~~~~~=====----- NOTICE: Order to shut down Shovel n°1 received. NOTICE: Order to shut down Shovel n°2 received. NOTICE: Order to shut down Shovel n°3 received. NOTICE: Order to shut down Crusher received. SHUTDOWN: Crusher is shutting down now... (3410 Tonnes of Ore processed. Idle time (after first truck passed through): 1.0 minutes. Total Time Lost due to Trucks stuck in line: 731.76 minutes. SHUTDOWN: Shovel n°1 is shutting down now... (1170 Tonnes of Ore loaded on trucks). Idle time (after first truck passed through): 15.0 minutes. Total Time Lost due to Trucks stuck in line: 189.52 minutes. SHUTDOWN: Shovel n°3 is shutting down now... (1120 Tonnes of Ore loaded on trucks). Idle time (after first truck passed through): 48.0 minutes. Total Time Lost due to Trucks stuck in line: 128.9 minutes. SHUTDOWN: Shovel n°2 is shutting down now... (1120 Tonnes of Ore loaded on trucks). Idle time (after first truck passed through): 44.0 minutes. Total Time Lost due to Trucks stuck in line: 119.63 minutes. Statistics for the Ryan Clemence 20T truck assigned to Shovel n°1 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 260.0 Tons Time in line at Shovel: 95.21 minutes Time in line at Crusher: 57.64 minutes Transit Time: 59.96 minutes Actual Work Time: 93.28 minutes Total Run Time: 306.09 minutes Throughput: 0.84 Tons of Ore/minute Statistics for the Dimitri Berlokovitz 20T truck assigned to Shovel n°1 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 260.0 Tons Time in line at Shovel: 89.73 minutes Time in line at Crusher: 72.35 minutes Transit Time: 58.48 minutes Actual Work Time: 96.05 minutes Total Run Time: 316.62 minutes Throughput: 0.82 Tons of Ore/minute Statistics for the Jean-Pierre LaMalice 50T truck assigned to Shovel n°1 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 650.0 Tons Time in line at Shovel: 4.58 minutes Time in line at Crusher: 42.0 minutes Transit Time: 69.98 minutes Actual Work Time: 193.57 minutes Total Run Time: 310.14 minutes Throughput: 2.09 Tons of Ore/minute Statistics for the Ronald Hochobar 20T truck assigned to Shovel n°2 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 240.0 Tons Time in line at Shovel: 70.07 minutes Time in line at Crusher: 101.58 minutes Transit Time: 50.58 minutes Actual Work Time: 82.21 minutes Total Run Time: 304.44 minutes Throughput: 0.78 Tons of Ore/minute Statistics for the Julie Lafontaine 20T truck assigned to Shovel n°2 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 280.0 Tons Time in line at Shovel: 44.87 minutes Time in line at Crusher: 111.6 minutes Transit Time: 58.51 minutes Actual Work Time: 97.0 minutes Total Run Time: 311.99 minutes Throughput: 0.89 Tons of Ore/minute Statistics for the Big John 50T truck assigned to Shovel n°2 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 600.0 Tons Time in line at Shovel: 4.69 minutes Time in line at Crusher: 64.11 minutes Transit Time: 66.92 minutes Actual Work Time: 166.17 minutes Total Run Time: 301.89 minutes Throughput: 1.98 Tons of Ore/minute Statistics for the Scout 20T truck assigned to Shovel n°3 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 260.0 Tons Time in line at Shovel: 63.54 minutes Time in line at Crusher: 107.43 minutes Transit Time: 56.9 minutes Actual Work Time: 89.34 minutes Total Run Time: 317.22 minutes Throughput: 0.81 Tons of Ore/minute Statistics for the Ruby 20T truck assigned to Shovel n°3 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 260.0 Tons Time in line at Shovel: 56.53 minutes Time in line at Crusher: 105.87 minutes Transit Time: 54.54 minutes Actual Work Time: 92.91 minutes Total Run Time: 309.86 minutes Throughput: 0.83 Tons of Ore/minute Statistics for the Pyro 50T truck assigned to Shovel n°3 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 600.0 Tons Time in line at Shovel: 8.82 minutes Time in line at Crusher: 69.14 minutes Transit Time: 63.64 minutes Actual Work Time: 162.42 minutes Total Run Time: 304.03 minutes Throughput: 1.97 Tons of Ore/minute BUILD SUCCESSFUL (total time: 5 minutes 22 seconds)