NOTICE: Order to shut down Shovel n°1 received. NOTICE: Order to shut down Shovel n°2 received. NOTICE: Order to shut down Shovel n°3 received. NOTICE: Order to shut down Crusher received. SHUTDOWN: Shovel n°2 is shutting down now... (1450 Tonnes of Ore loaded on trucks). Idle time (after first truck passed through): 7.0 minutes. Total Time Lost due to Trucks stuck in line: 130.71 minutes. SHUTDOWN: Crusher is shutting down now... (3580 Tonnes of Ore processed. Idle time (after first truck passed through): 2.0 minutes. Total Time Lost due to Trucks stuck in line: 939.32 minutes. SHUTDOWN: Shovel n°3 is shutting down now... (1290 Tonnes of Ore loaded on trucks). Idle time (after first truck passed through): 26.0 minutes. Total Time Lost due to Trucks stuck in line: 108.96 minutes. SHUTDOWN: Shovel n°1 is shutting down now... (840 Tonnes of Ore loaded on trucks). Idle time (after first truck passed through): 75.0 minutes. Total Time Lost due to Trucks stuck in line: 56.39 minutes. Statistics for the Ryan Clemence 20T truck assigned to Shovel n°1 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 280.0 Tons Time in line at Shovel: 10.96 minutes Time in line at Crusher: 149.66 minutes Transit Time: 62.01 minutes Actual Work Time: 95.84 minutes Total Run Time: 318.48 minutes Throughput: 0.87 Tons of Ore/minute Statistics for the Dimitri Berlokovitz 20T truck assigned to Shovel n°1 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 260.0 Tons Time in line at Shovel: 29.27 minutes Time in line at Crusher: 131.12 minutes Transit Time: 56.62 minutes Actual Work Time: 90.23 minutes Total Run Time: 307.24 minutes Throughput: 0.84 Tons of Ore/minute Statistics for the Jean-Pierre LaMalice 20T truck assigned to Shovel n°1 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 300.0 Tons Time in line at Shovel: 16.15 minutes Time in line at Crusher: 127.83 minutes Transit Time: 63.44 minutes Actual Work Time: 106.96 minutes Total Run Time: 314.39 minutes Throughput: 0.95 Tons of Ore/minute Statistics for the Ronald Hochobar 50T truck assigned to Shovel n°2 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 500.0 Tons Time in line at Shovel: 32.77 minutes Time in line at Crusher: 80.85 minutes Transit Time: 53.6 minutes Actual Work Time: 144.75 minutes Total Run Time: 311.97 minutes Throughput: 1.6 Tons of Ore/minute Statistics for the Julie Lafontaine 50T truck assigned to Shovel n°2 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 450.0 Tons Time in line at Shovel: 47.24 minutes Time in line at Crusher: 83.59 minutes Transit Time: 49.76 minutes Actual Work Time: 122.5 minutes Total Run Time: 303.09 minutes Throughput: 1.48 Tons of Ore/minute Statistics for the Big John 50T truck assigned to Shovel n°2 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 500.0 Tons Time in line at Shovel: 50.7 minutes Time in line at Crusher: 78.62 minutes Transit Time: 55.7 minutes Actual Work Time: 141.72 minutes Total Run Time: 326.74 minutes Throughput: 1.53 Tons of Ore/minute Statistics for the Scout 20T truck assigned to Shovel n°3 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 240.0 Tons Time in line at Shovel: 68.39 minutes Time in line at Crusher: 106.94 minutes Transit Time: 53.12 minutes Actual Work Time: 85.75 minutes Total Run Time: 314.21 minutes Throughput: 0.76 Tons of Ore/minute Statistics for the Ruby 50T truck assigned to Shovel n°3 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 500.0 Tons Time in line at Shovel: 22.8 minutes Time in line at Crusher: 92.03 minutes Transit Time: 53.94 minutes Actual Work Time: 137.29 minutes Total Run Time: 306.06 minutes Throughput: 1.63 Tons of Ore/minute Statistics for the Pyro 50T truck assigned to Shovel n°3 and the Ace Crusher ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Ore Processed: 550.0 Tons Time in line at Shovel: 17.75 minutes Time in line at Crusher: 88.65 minutes Transit Time: 58.66 minutes Actual Work Time: 156.75 minutes Total Run Time: 321.81 minutes Throughput: 1.7 Tons of Ore/minute BUILD SUCCESSFUL (total time: 5 minutes 30 seconds)